PT YTL, Situbondo, site Paiton II . Jawa Timur , Sistem Manajemen Energi, SNI ISO 50001:2018 , 18 sd 20 september 2024

 

PT. Jawa Power owns a 1,220 MW coal fired power station located at the Paiton power generation complex in East Java, Indonesia. Jawa Power is one of the largest IPPs in Indonesia with a 30-year power purchase agreement with PT. PLN (Persero), the state-owned electric utility company. The power station supplies electricity into the Java-Bali 500 kV grid, which is owned and operated by PLN.

Current Energy Sources :

1. Electricity :

- source: internal & 150 kV PLN

- utilised by : motors, lamps, HVAC, etc

2. Coal :

- 3 different mines: kideco, berau & adaro

- only consumed/ burnt in steam generating units (boiler)

3. Diesel Fuel/Fuel oil B35:

Consumed at : boiler for start-up and firing support, mobile equipments, tugboats,

emergency genset.

The power station began construction in 1996 and entered commercial operation in 2000.

The design, Engineering, Procurement, Construction (EPC) and commissioning start-up of the power station was undertaken by a consortium led by Siemens. YTL Power International’s wholly-owned subsidiary, PT YTL Jawa Timur, is the O&M operator for Jawa Power.

·        Witness LSSME PT TÜV NORD Indonesia dilaksanakan pada Survailen 1,  SNI ISO 50001:2018 , di PT YTL JAWA TIMUR - site Paiton II dengan, ruang lingkup Power Generation, Paiton II Site, including Main Plant (Boiler, Steam Turbine, Generator, BOP), Aux Plant, WTP, ECP, CW System, Workshop & Main Technical Store, Office Building, Coal Plant & Operator Housing Complex ; Jl. Raya Surabaya-Situbondo KM 141, Paiton, Probolinggo - 67291 – Indonesia

Standar Yang digunakan :  SNI ISO/IEC 17021-1:2015; SNI ISO 50003:2021; SNI ISO 50001:2018; KAN U; KAN K-07 Rev.1; KAN K-07.05; IAF MD dan regulasi terkait